The large bracket is matched with our store''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''s insulation bag, and the single shot bracket will not be shipped
Installation steps diagram of large fermentation tank
①Inventory accessories: large fermentation tank bracket contains
6 pieces41cm poles, 10 30cm poles, 8 tee heads,8 grippers, 4 transparent sleeves
② Installation gripper: take2 41cm poles, Two 30cm poles with grippers on each end.
③ take4 41cm, 4 30cm poles and8 tees, put together into 2 same rectanglesshape(Tighten the connection between the pole and the tee)
④ takeInsert 4 30cm rods into one of themrectangular4 three-way heads, 4 transparentCasing4 30cm poles(Transparent sleeveThe role of the tube is to prevent the grab bar from sliding down)
⑤Take another rectangular shape, three-way Aim downBuckle up 4 30cm polesGo and form a cuboid
⑥take2 30cm poles with a gripper Don’t buckle to the left and right sides of the corresponding length,The gripper is buckled on the transparent sleeve(FigureShow red circle)
⑦take2 41cm poles with grips attachedabout2 30cm grab bars(Icon redCircle)Form a barrier. The bracket is installed.
⑧ Open the insulation bag and put it on its side(as the picture shows)
⑨Put the heating film upright and push it carefullyThe heating film is located on the left, right and back three sides of the bag
ten: Push the installed bracket carefully and horizontally,Don''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''t use too much force to avoid scratching the inner layer of the bag.note:4 transparent sleeves under the bracket (The position of the red circle)
eleven: When the fermentation tank is working, pull it upZipper, the power cord extends from the zipper opening,(Shown by the green circle), The thermostat is placed outside the boxPlug in(Shown in blue circle)
Schematic diagram of thermostat operation
Precautions
If you want to test the temperature, please put your own thermometer in the middle of the fermentation tank to test(Same layer as temperature control probe), Don’t put it on the bottom.